HDR Remodeling
 
space
space
space
space

Deck Projects

After

What we did:

  • We removed the entire failed deck and rail assembly and replaced with Trex composite decking on the pressure treated joists, beams and posts
  • The deck at the outer edge is above 30 feet of the hillside. The dry rot was extensive
  • We upgraded the old wood and wire rail assembly with the new aviation wire, making it almost invisible but still safe for the kids to play on
  • We also installed new French doors with side lights.
Before
before
After after
French Doors after2